![]() ![]() In order to prevent puncturing the cooling pipes, additional care and attention is required during the initial stages of ice making with a sand floor. As with a sand floor, the ice surface can be covered for non-ice events while the ice is in place. With a properly engineered floor, a circus or other heavy event can be held as well. ![]() A cement floor increases the flexibility of the facility in that dances, bingo's, and trade shows can be held in the off season. If for some reason the building must be sold, a sand floor will reduce the buildings usefulness and resale value.Ī cement floor for an NHL size ice rink will cost between $50,000.00 and $125,000.00 more than a sand floor depending on the floor strength, proximity of material, and a good super-flat contractor. An ice covering can be used to facilitate light activities on top of the ice, but there is not enough support for rodeos, tractor pulls etc. A sand floor is generally used in a year round ice facility but can be installed in a seasonal facility with some precautions to prevent unwanted traffic on the piping system during the off season.Ī sand floor reduces the flexibility of the facility in that no off-season activities can be held directly on top of the sand. Sand floors are utilized to reduce the initial cost of an ice surface. Hopefully the following should make your decision easier. ![]() There are good reasons for installing both sand floors and cement floors in an ice skating facility. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |